1. 11 10月, 2019 1 次提交
    • Q
      api server startup modify (#986) · 9b836aa5
      qiaozhanwei 提交于
      * add ConnectionFactoryTest and ConnectionFactory read datasource from appliction.yml
      
      * .escheduler_env.sh to dolphinscheduler_env.sh
      
      * dao yml assembly to conf directory
      
      * table name modify
      
      * entity title table  name modify
      
      * logback log name modify
      
      * running through the big process
      
      * running through the big process error modify
      
      * logback log name modify
      
      * data_source.properties rename
      
      * logback log name modify
      
      * install.sh optimization
      
      * install.sh optimization
      
      * command count modify
      
      * command state update
      
      * countCommandState sql update
      
      * countCommandState sql update
      
      * remove application.yml file
      
      * master.properties modify
      
      * install.sh modify
      
      * install.sh modify
      
      * api server startup modify
      9b836aa5
  2. 10 10月, 2019 3 次提交
    • Q
      countCommandState sql update (#981) · f5a5ea05
      qiaozhanwei 提交于
      * add ConnectionFactoryTest and ConnectionFactory read datasource from appliction.yml
      
      * .escheduler_env.sh to dolphinscheduler_env.sh
      
      * dao yml assembly to conf directory
      
      * table name modify
      
      * entity title table  name modify
      
      * logback log name modify
      
      * running through the big process
      
      * running through the big process error modify
      
      * logback log name modify
      
      * data_source.properties rename
      
      * logback log name modify
      
      * install.sh optimization
      
      * install.sh optimization
      
      * command count modify
      
      * command state update
      
      * countCommandState sql update
      
      * countCommandState sql update
      f5a5ea05
    • B
      update application.yml to application.properties (#980) · 57080c96
      bao liang 提交于
      * update english documents
      
      * refactor zk client
      
      * update documents
      
      * update zkclient
      
      * update zkclient
      
      * update documents
      
      * add architecture-design
      
      * change i18n
      
      * update i18n
      
      * update english documents
      
      * add architecture-design
      
      * update english documents
      
      * update en-US documents
      
      * add architecture-design
      
      * update demo site
      
      * add mybatis plus model
      
      * modify mybatisplus
      
      * modify mybatisplus
      
      * change interface by mybatisplus
      
      * add unit test
      
      * refactor dao interface.
      
      * add unit test for dao...
      
      * add unit test for dao...
      
      * add unit test for dao...
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ScheduleMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProcessInstanceMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectUserMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/QueueMapper.xml
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProcessInstanceMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProjectUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/QueueMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ResourceUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ScheduleMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/SessionMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/TenantMapperTest.java
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ScheduleMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProcessInstanceMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectUserMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/QueueMapper.xml
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProcessInstanceMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProjectUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/QueueMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ResourceUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ScheduleMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/SessionMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/TenantMapperTest.java
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ResourceMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/TaskInstanceMapper.xml
      
      * update some dao bugs
      
      * update for some bugs
      
      * update some bugs
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ResourceMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/TaskInstanceMapper.xml
      
      * update
      
      * update
      
      * add multiply settings for application.yml
      
      * add multiply settings for application.yml
      
      * revert
      
      * update configuration settings in task record dao...
      
      * change application_master to application-master
      
      * change application_master to application-master
      
      * update application.yml to application.properties
      
      * revert
      57080c96
    • L
      Add alertDao to spring management (#978) · 84c3e9e5
      lgcareer 提交于
      * rename from DatasourceUserMapper to DataSourceUserMapper
      
      * add unit test in UserMapper and WorkerGroupMapper
      
      * change cn.escheduler to org.apache.dolphinscheduler
      
      * add unit test in UdfFuncMapperTest
      
      * add unit test in UdfFuncMapperTest
      
      * remove DatabaseConfiguration
      
      * add ConnectionFactoryTest
      
      * cal duration in processInstancesList
      
      * change desc to description
      
      * change table name in mysql ddl
      
      * change table name in mysql ddl
      
      * change escheduler to dolphinscheduler
      
      * change escheduler to dolphinscheduler
      
      * change escheduler to dolphinscheduler
      
      * remove log4j-1.2-api and modify AlertMapperTest
      
      * remove log4j-1.2-api
      
      * Add alertDao to spring management
      
      * Add alertDao to spring management
      84c3e9e5
  3. 09 10月, 2019 1 次提交
    • B
      add multiply settings for application.yml (#973) · 6a48b985
      bao liang 提交于
      * update english documents
      
      * refactor zk client
      
      * update documents
      
      * update zkclient
      
      * update zkclient
      
      * update documents
      
      * add architecture-design
      
      * change i18n
      
      * update i18n
      
      * update english documents
      
      * add architecture-design
      
      * update english documents
      
      * update en-US documents
      
      * add architecture-design
      
      * update demo site
      
      * add mybatis plus model
      
      * modify mybatisplus
      
      * modify mybatisplus
      
      * change interface by mybatisplus
      
      * add unit test
      
      * refactor dao interface.
      
      * add unit test for dao...
      
      * add unit test for dao...
      
      * add unit test for dao...
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ScheduleMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProcessInstanceMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectUserMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/QueueMapper.xml
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProcessInstanceMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProjectUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/QueueMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ResourceUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ScheduleMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/SessionMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/TenantMapperTest.java
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ScheduleMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProcessInstanceMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectUserMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/QueueMapper.xml
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProcessInstanceMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProjectUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/QueueMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ResourceUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ScheduleMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/SessionMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/TenantMapperTest.java
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ResourceMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/TaskInstanceMapper.xml
      
      * update some dao bugs
      
      * update for some bugs
      
      * update some bugs
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ResourceMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/TaskInstanceMapper.xml
      
      * update
      
      * update
      
      * add multiply settings for application.yml
      
      * add multiply settings for application.yml
      
      * revert
      6a48b985
  4. 08 10月, 2019 4 次提交
    • L
      change escheduler to dolphinscheduler (#963) · 7e815b44
      lgcareer 提交于
      * rename from DatasourceUserMapper to DataSourceUserMapper
      
      * add unit test in UserMapper and WorkerGroupMapper
      
      * change cn.escheduler to org.apache.dolphinscheduler
      
      * add unit test in UdfFuncMapperTest
      
      * add unit test in UdfFuncMapperTest
      
      * remove DatabaseConfiguration
      
      * add ConnectionFactoryTest
      
      * cal duration in processInstancesList
      
      * change desc to description
      
      * change table name in mysql ddl
      
      * change table name in mysql ddl
      
      * change escheduler to dolphinscheduler
      
      * change escheduler to dolphinscheduler
      
      * change escheduler to dolphinscheduler
      7e815b44
    • Q
      running through the big process error modify (#962) · ed04835c
      qiaozhanwei 提交于
      * add ConnectionFactoryTest and ConnectionFactory read datasource from appliction.yml
      
      * .escheduler_env.sh to dolphinscheduler_env.sh
      
      * dao yml assembly to conf directory
      
      * table name modify
      
      * entity title table  name modify
      
      * logback log name modify
      
      * running through the big process
      
      * running through the big process error modify
      ed04835c
    • L
      change escheduler to dolphinscheduler (#961) · 31f9fbf3
      lgcareer 提交于
      * rename from DatasourceUserMapper to DataSourceUserMapper
      
      * add unit test in UserMapper and WorkerGroupMapper
      
      * change cn.escheduler to org.apache.dolphinscheduler
      
      * add unit test in UdfFuncMapperTest
      
      * add unit test in UdfFuncMapperTest
      
      * remove DatabaseConfiguration
      
      * add ConnectionFactoryTest
      
      * cal duration in processInstancesList
      
      * change desc to description
      
      * change table name in mysql ddl
      
      * change table name in mysql ddl
      
      * change escheduler to dolphinscheduler
      
      * change escheduler to dolphinscheduler
      31f9fbf3
    • Q
      running through the big process (#959) · be59cda0
      qiaozhanwei 提交于
      * add ConnectionFactoryTest and ConnectionFactory read datasource from appliction.yml
      
      * .escheduler_env.sh to dolphinscheduler_env.sh
      
      * dao yml assembly to conf directory
      
      * table name modify
      
      * entity title table  name modify
      
      * logback log name modify
      
      * running through the big process
      be59cda0
  5. 30 9月, 2019 4 次提交
    • B
      Merge remote-tracking branch 'upstream/dev-db' into dev-db (#951) · b725a958
      bao liang 提交于
      * update english documents
      
      * refactor zk client
      
      * update documents
      
      * update zkclient
      
      * update zkclient
      
      * update documents
      
      * add architecture-design
      
      * change i18n
      
      * update i18n
      
      * update english documents
      
      * add architecture-design
      
      * update english documents
      
      * update en-US documents
      
      * add architecture-design
      
      * update demo site
      
      * add mybatis plus model
      
      * modify mybatisplus
      
      * modify mybatisplus
      
      * change interface by mybatisplus
      
      * add unit test
      
      * refactor dao interface.
      
      * add unit test for dao...
      
      * add unit test for dao...
      
      * add unit test for dao...
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ScheduleMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProcessInstanceMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectUserMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/QueueMapper.xml
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProcessInstanceMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProjectUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/QueueMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ResourceUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ScheduleMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/SessionMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/TenantMapperTest.java
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ScheduleMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProcessInstanceMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectUserMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/QueueMapper.xml
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProcessInstanceMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProjectUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/QueueMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ResourceUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ScheduleMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/SessionMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/TenantMapperTest.java
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/ResourceMapper.xml
      #	dolphinscheduler-dao/src/main/resources/org/apache/dolphinscheduler/dao/mapper/TaskInstanceMapper.xml
      b725a958
    • B
      update ut for mybatisplus (#950) · b5636b04
      bao liang 提交于
      * update english documents
      
      * refactor zk client
      
      * update documents
      
      * update zkclient
      
      * update zkclient
      
      * update documents
      
      * add architecture-design
      
      * change i18n
      
      * update i18n
      
      * update english documents
      
      * add architecture-design
      
      * update english documents
      
      * update en-US documents
      
      * add architecture-design
      
      * update demo site
      
      * add mybatis plus model
      
      * modify mybatisplus
      
      * modify mybatisplus
      
      * change interface by mybatisplus
      
      * add unit test
      
      * refactor dao interface.
      
      * add unit test for dao...
      
      * add unit test for dao...
      
      * add unit test for dao...
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ScheduleMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProcessInstanceMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectUserMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/QueueMapper.xml
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProcessInstanceMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProjectUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/QueueMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ResourceUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ScheduleMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/SessionMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/TenantMapperTest.java
      
      * Merge remote-tracking branch 'upstream/dev-db' into dev-db
      
      # Conflicts:
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectMapper.xml
      #	dolphinscheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ScheduleMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProcessInstanceMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/ProjectUserMapper.xml
      #	escheduler-dao/src/main/resources/cn.escheduler.dao.mapper/QueueMapper.xml
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProcessInstanceMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ProjectUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/QueueMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ResourceUserMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/ScheduleMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/SessionMapperTest.java
      #	escheduler-dao/src/test/java/cn/escheduler/dao/mapper/TenantMapperTest.java
      b5636b04
    • L
      cal duration in processInstancesList (#944) · 4ea0466b
      lgcareer 提交于
      * rename from DatasourceUserMapper to DataSourceUserMapper
      
      * add unit test in UserMapper and WorkerGroupMapper
      
      * change cn.escheduler to org.apache.dolphinscheduler
      
      * add unit test in UdfFuncMapperTest
      
      * add unit test in UdfFuncMapperTest
      
      * remove DatabaseConfiguration
      
      * add ConnectionFactoryTest
      
      * cal duration in processInstancesList
      
      * change desc to description
      4ea0466b
    • L
      cal duration in processInstancesList (#943) · 60a13bf5
      lgcareer 提交于
      * rename from DatasourceUserMapper to DataSourceUserMapper
      
      * add unit test in UserMapper and WorkerGroupMapper
      
      * change cn.escheduler to org.apache.dolphinscheduler
      
      * add unit test in UdfFuncMapperTest
      
      * add unit test in UdfFuncMapperTest
      
      * remove DatabaseConfiguration
      
      * add ConnectionFactoryTest
      
      * cal duration in processInstancesList
      60a13bf5
  6. 29 9月, 2019 2 次提交