sched/numa: Ensure task_numa_migrate() checks the preferred node
The first thing task_numa_migrate() does is check to see if there is CPU capacity available on the preferred node, in order to move the task there. However, if the preferred node is all busy, we would skip considering that node for tasks swaps in the subsequent loop. This prevents NUMA convergence of tasks on busy systems. However, swapping locations with a task on our preferred nid, when the preferred nid is busy, is perfectly fine. The fix is to also look for a CPU on our preferred nid when it is totally busy. This changes "perf bench numa mem -p 4 -t 20 -m -0 -P 1000" from not converging in 15 minutes on my 4 node system, to converging in 10-20 seconds. Signed-off-by: NRik van Riel <riel@redhat.com> Signed-off-by: NPeter Zijlstra <peterz@infradead.org> Cc: mgorman@suse.de Cc: Linus Torvalds <torvalds@linux-foundation.org> Link: http://lkml.kernel.org/r/20140604160942.6969b101@cuia.bos.redhat.comSigned-off-by: NIngo Molnar <mingo@kernel.org>
Showing
想要评论请 注册 或 登录