sched: Avoid prev->stime underflow
Dave Hansen reported strange utime/stime values on his system: https://lkml.org/lkml/2013/4/4/435 This happens because prev->stime value is bigger than rtime value. Root of the problem are non-monotonic rtime values (i.e. current rtime is smaller than previous rtime) and that should be debugged and fixed. But since problem did not manifest itself before commit 62188451 "cputime: Avoid multiplication overflow on utime scaling", it should be threated as regression, which we can easily fixed on cputime_adjust() function. For now, let's apply this fix, but further work is needed to fix root of the problem. Reported-and-tested-by: NDave Hansen <dave@sr71.net> Cc: <stable@vger.kernel.org> # 3.9+ Signed-off-by: NStanislaw Gruszka <sgruszka@redhat.com> Cc: Frederic Weisbecker <fweisbec@gmail.com> Cc: rostedt@goodmis.org Cc: Linus Torvalds <torvalds@linux-foundation.org> Cc: Dave Hansen <dave@sr71.net> Cc: Peter Zijlstra <peterz@infradead.org> Link: http://lkml.kernel.org/r/1367314507-9728-3-git-send-email-sgruszka@redhat.comSigned-off-by: NIngo Molnar <mingo@kernel.org>
Showing
想要评论请 注册 或 登录