提交 3aa2dbe2 编写于 作者: L Luca Abeni 提交者: Ingo Molnar

sched/dl/Documentation: Fix typos

Signed-off-by: NLuca Abeni <luca.abeni@unitn.it>
Signed-off-by: NPeter Zijlstra (Intel) <peterz@infradead.org>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Thomas Gleixner <tglx@linutronix.de>
Cc: henrik@austad.us
Cc: juri.lelli@gmail.com
Cc: raistlin@linux.it
Link: http://lkml.kernel.org/r/1431954032-16473-4-git-send-email-luca.abeni@unitn.itSigned-off-by: NIngo Molnar <mingo@kernel.org>
上级 3a3a58d4
...@@ -52,7 +52,7 @@ CONTENTS ...@@ -52,7 +52,7 @@ CONTENTS
"admission control" strategy (see Section "4. Bandwidth management") is used "admission control" strategy (see Section "4. Bandwidth management") is used
(clearly, if the system is overloaded this guarantee cannot be respected). (clearly, if the system is overloaded this guarantee cannot be respected).
Summing up, the CBS[2,3] algorithms assigns scheduling deadlines to tasks so Summing up, the CBS[2,3] algorithm assigns scheduling deadlines to tasks so
that each task runs for at most its runtime every period, avoiding any that each task runs for at most its runtime every period, avoiding any
interference between different tasks (bandwidth isolation), while the EDF[1] interference between different tasks (bandwidth isolation), while the EDF[1]
algorithm selects the task with the earliest scheduling deadline as the one algorithm selects the task with the earliest scheduling deadline as the one
...@@ -190,7 +190,7 @@ CONTENTS ...@@ -190,7 +190,7 @@ CONTENTS
- deadline = D - deadline = D
- period <= P - period <= P
IOW, if runtime >= WCET and if period is >= P, then the scheduling deadlines IOW, if runtime >= WCET and if period is <= P, then the scheduling deadlines
and the absolute deadlines (d_j) coincide, so a proper admission control and the absolute deadlines (d_j) coincide, so a proper admission control
allows to respect the jobs' absolute deadlines for this task (this is what is allows to respect the jobs' absolute deadlines for this task (this is what is
called "hard schedulability property" and is an extension of Lemma 1 of [2]). called "hard schedulability property" and is an extension of Lemma 1 of [2]).
......
Markdown is supported
0% .
You are about to add 0 people to the discussion. Proceed with caution.
先完成此消息的编辑!
想要评论请 注册