sched: batch sleeper bonus
batch up the sleeper bonus sum a bit more. Anything below
sched-granularity is too small to make a practical difference
anyway.
this optimization reduces the math in high-frequency scheduling
scenarios.
Signed-off-by: NIngo Molnar <mingo@elte.hu>
Showing
想要评论请 注册 或 登录