If multiple trace tasks with the same name need to be performed at the same time or a trace task needs to be performed multiple times concurrently, different task IDs must be specified in **startTrace**.
If multiple trace tasks with the same name need to be performed at the same time or a trace task needs to be performed multiple times concurrently, different task IDs must be specified in **startTrace**.