- 16 12月, 2014 2 次提交
-
-
由 Sagi Grimberg 提交于
In case of the HCA going into catasrophic error flow, the beacon post_send is likely to fail, so surely there will be no completion for it. In this case, use a best effort approach and don't wait for beacon completion if we failed to post the send. Reported-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Minh Tran 提交于
Re-adjust max CQEs per CQ and max send_wr per QP according to the resource limits supported by underlying hardware. Signed-off-by: NMinh Tran <minhduc.tran@emulex.com> Signed-off-by: NJayamohan Kallickal <jayamohan.kallickal@emulex.com> Acked-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
- 09 10月, 2014 13 次提交
-
-
由 Sagi Grimberg 提交于
Singal completion of every 32 scsi commands and suppress all the rest. We don't do anything upon getting the completion so no need to "just consume" it. Cleanup of scsi command is done in cleanup_task callback. Still keep dataout and control send completions as we may need to cleanup there. This helps reducing the amount of interrupts/completions in the IO path. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
Poll in batch of 16. Since we don't want it on the stack, keep under iser completion context (iser_comp). Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
Avoid post_send counting (atomic) in the IO path just to keep track of how many completions we need to consume. Use a beacon post to indicate that all prior posts completed. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
This will solve a possible condition where we might miss TX completion (flush error) during session teardown. Since we are using a single CQ, we don't need to actively drain the TX CQ, instead just wait for flush_completion (when counters reach zero) and remove iser_poll_for_flush_errors(). This patch might introduce a minor performance regression on its own, but the next patches will enhance performance using a single CQ for RX and TX. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
We need a way to guarentee that we don't stay in soft-IRQ context for too long. We might starve other pending CQ tasklets or worse lock against application trying to issue IO on the running CPU. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
Introduce iser_comp which centralizes all iser completion related items and is referenced by iser_device and each ib_conn. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Ariel Nahum 提交于
In case iscsid was violently killed (SIGKILL) during its error recovery stage, we may never get a connection teardown sequence for some of the old connections. No harm done, but when we try to unload the module we will need to cleanup all these connections. So we actually may end-up here - so it's not a BUG_ON(), just give a relaxed warning that this happened and continue with normal unload. BUG_ON() will cause segfault on module_exit and we don't want that. Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
Previously we notified iscsi layer about the connection layer when we consumed all of our flush errors. This was racy as there was no guarentee that iscsi_conn wasn't terminated by then (which ends up in an invalid memory access). In case we got a non FLUSH error completion, we are guarenteed that iscsi_conn is still alive. We should notify iSCSI layer with iscsi_conn_failure to initiate error handling. While we are at it, add a nice kernel-doc style documentation. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
We no longer rely on iscsi connection teardown sequence, so no need to give a grace period and continue cleanup if it expired. Have iser_conn_release wait for full completion before freeing iser_conn. ib_completion: Guaranteed to come when: - Got DISCONNECTED/ADDR_CHANGE event or - iSCSI called ep_disconnect/conn_stop Guaranteed to finish when: - Got TIMEWAIT_EXIT/DEVICE_REMOVAL event - All Flush errors are consumed - IB related resources are destroyed stop_completion: Guaranteed to come when: - iSCSI calls conn_stop Guaranteed to finish when: - All inflight tasks were cleaned up Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
iscsi daemon is in user-space, thus we can't rely on it to be invoked at connection teardown (if not running or does not receive CPU time). This patch addresses the issue by re-structuring iSER connection teardown logic and CM events handling. The CM events will dictate the RDMA resources destruction (ib_conn) and iser_conn is kept around as long as iscsi_conn is left around allowing iscsi/iser callbacks to continue after RDMA transport was destroyed. This patch introduces a separation in logic when handling CM events: - DISCONNECTED_HANDLER, ADDR_CHANGED This events indicate the start of teardown process. Actions: 1. Terminate the connection: rdma_disconnect (send DREQ/DREP) 2. Notify iSCSI of connection failure 3. Change state to TERMINATING 4. Poll for all flush errors to be consumed - TIMEWAIT_EXIT, DEVICE_REMOVAL These events indicate the final stage of termination process and we can free RDMA related resources. Actions: 1. Call disconnected handler (we are not guaranteed that DISCONNECTED event was invoked in the past) 2. Cleanup RDMA related resources 3. For DEVICE_REMOVAL return non-zero rc from cma_handler to implicitly destroy the cm_id (Can't rely on user-space, make sure we have forward progress) We replace flush_completion (indicate all flushes were consumed) with ib_completion (rdma resources were cleaned up). The iser_conn_release_work will wait for teardown completions: - conn_stop was completed (tasks were cleaned-up) - stop_completion - RDMA resources were destroyed - ib_completion And then will continue to free iser connection representation (iser_conn). Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
Put all connection IB related resources release in this routine. One exception is the cm_id which cannot be destroyed as the routine is protected by the state mutex. Also move its position to avoid forward declaration. While at it fix qp NULL assignment. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
Structure that describes the RDMA relates connection objects. Static member of iser_conn. This patch does not change any functionality Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
Two reasons why we choose to do this: 1. No point today calling struct iser_conn by another name ib_conn 2. In the next patches we will restructure iser control plane representation - struct iser_conn: connection logical representation - struct ib_conn: connection RDMA layout representation This patch does not change any functionality. Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
- 23 9月, 2014 1 次提交
-
-
由 Roi Dayan 提交于
When failing to allocate TX CQ we already allocated RX CQ, so we need to make sure we release it. Also, when failing to register notification to the RX CQ we currently leak both RX and TX CQs of the current index, fix that too. Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
- 02 8月, 2014 8 次提交
-
-
由 Roi Dayan 提交于
This is to prevent someone from thinking that this code section is redundant. Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Ariel Nahum 提交于
Instead of waiting for events and condition changes of the iser connection state, we wait for explicit completion of connection establishment and teardown. Separate connection establishment wait object from the teardown object to avoid a situation where racing connection establishment and teardown may concurrently wakeup each other. ep_poll will wait for up_completion invoked by iser_connected_handler() and iser release worker will wait for flush_completion before releasing the connection. Bound the completion wait with a 30 seconds timeout for cases where iscsid (the user space iscsi daemon) is too slow or gone. Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Ariel Nahum 提交于
The iser connection state lookups and transitions are not fully protected. Some transitions are protected with a spinlock, and in some cases the state is accessed unprotected due to specific assumptions of the flow. Introduce a new mutex to protect the connection state access. We use a mutex since we need to also include a scheduling operations executed under the state lock. Each state transition/condition and its corresponding action will be protected with the state mutex. The rdma_cm events handler acquires the mutex when handling connection events. Since iser connection state can transition to DOWN concurrently during connection establishment, we bailout from addr/route resolution events when the state is not PENDING. This addresses a scenario where ep_poll retries expire during CMA connection establishment. In this case ep_disconnect is invoked while CMA events keep coming (address/route resolution, connected, etc...). Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
Make it void. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Ariel Nahum 提交于
iser connection needs asynchronous cleanup completions which are triggered in ep_disconnect. As a result we are keeping the corresponding iscsi_endpoint structure hanging for no good reason. In order to avoid that, we seperate iser_conn from iscsi_endpoint storage space to have their destruction being independent. iscsi_endpoint will be destroyed at ep_disconnect stage, while the iser connection will wait for asynchronous completions to be released in an orderly fashion. Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
The iser initiator is the RDMA responder so it should publish to the target the max inflight rdma read requests its local HCA can handle in responder_resources (max_qp_rd_atom). The iser target should take the min of that and its local HCA max inflight oustanding rdma read requests (max_qp_init_rd_atom). We keep initiator_depth set to 1 in order to compat with old targets. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Roi Dayan 提交于
In case the DISCONNECTED event is not delivered after rdma_disconnect is called, the CM waits TIMEWAIT seconds and delivers the TIMEWAIT_EXIT local event. We use this as the notification needed to continue in the teardown and release sequence. Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NRoi Dayan <roid@mellanox.com> Reviewed-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Roi Dayan 提交于
Replace struct sockaddr_in with struct sockaddr which supports both IPv4 and IPv6, and print using the %pIS format directive. Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
- 26 5月, 2014 2 次提交
-
-
由 Ariel Nahum 提交于
In some circumstances (multiple targets), RDMA_CM ESTABLISHED event and ep_disconnect may race. In this case, the iser connection state may transition to UP (after ep_disconnect transitioned it to TERMINATING), while the connection is being torn down. Upon RDMA_CM event ESTABLISHED we allow iser connection state to transition to UP only from PENDING. We also make sure to protect this state change (done under the connection lock). Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Reviewed-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Ariel Nahum 提交于
iSER relies on refcounting to manage iser connections establishment and teardown. Following commit 39ff05db ("IB/iser: Enhance disconnection logic for multi-pathing"), iser connection maintain 3 references: - iscsi_endpoint (at creation stage) - cma_id (at connection request stage) - iscsi_conn (at bind stage) We can avoid taking explicit refcounts by correctly serializing iser teardown flows (graceful and non-graceful). Our approach is to trigger a scheduled work to handle ordered teardown by gracefully waiting for 2 cleanup stages to complete: 1. Cleanup of live pending tasks indicated by iscsi_conn_stop completion 2. Flush errors processing Each completed stage will notify a waiting worker thread when it is done to allow teardwon continuation. Since iSCSI connection establishment may trigger endpoint disconnect without a successful endpoint connect, we rely on the iscsi <-> iser binding (.conn_bind) to learn about the teardown policy we should take wrt cleanup stages. Since all cleanup worker threads are scheduled (release_wq) in .ep_disconnect it is safe to assume that when module_exit is called, all cleanup workers are already scheduled. Thus proper module unload shall flush all scheduled works before allowing safe exit, to guarantee no resources got left behind. Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Reviewed-by: NRoi Dayan <roid@mellanox.com> Reviewed-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
- 02 4月, 2014 5 次提交
-
-
由 Or Gerlitz 提交于
Update Mellanox copyrights for 2014 on the iser initiator driver. Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Or Gerlitz 提交于
Add an iser info print with the local/remote QP information carried out when the connection is established. While here, fix a little leftover from the T10 work and set a debug print to be carried in debug and not info level. Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Ariel Nahum 提交于
The iscsi stack has existing mechanisms to link back and forth between the iscsi connection and the iscsi transport (e.g iser/tcp) connection. This is done through a dd_data pointer field in struct iscsi_conn which can be set to point to the transport connection, etc. The iscsi_iser_conn structure was used to get this linking done in another way, which is uneeded and adds extra complication to the iser code, so we just remove it. Signed-off-by: NAriel Nahum <arieln@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Roi Dayan 提交于
The iser disconnection flow isn't done before all the inflight recv/send buffers posted to the QP are either flushed or normally completed to the CQ that serves this connection. The condition check is done in iser_handle_comp_error(). Currently, it's possible for the send buffer completion that makes the posted send buffers counter reach zero to be polled in the drain tx call, which is after the rx cq is fully drained. Since this completion might be not an error one (for example, it might be a completion of the logout request iSCSI PDU) we will skip iser_handle_comp_error(). So the connection will never terminate from the iscsi stack point of view, and we hang. To resolve this race, do the draining of the tx cq before the loop on the rx cq. Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Randy Dunlap 提交于
Fix pr_err (printk) format warning: drivers/infiniband/ulp/iser/iser_verbs.c:1181:4: warning: format '%lx' expects argument of type 'long unsigned int', but argument 3 has type 'sector_t' [-Wformat] Signed-off-by: NRandy Dunlap <rdunlap@infradead.org> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
- 18 3月, 2014 8 次提交
-
-
由 Sagi Grimberg 提交于
Once the iSCSI transaction is completed we must implement check_protection in order to notify on DIF errors that may have occured. The routine boils down to calling ib_check_mr_status to get the signature status of the transaction. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Alex Tabachnik 提交于
During connection establishment we also initialize T10-PI resources (QP, PI contexts) in order to support SCSI's protection operations. Signed-off-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Alex Tabachnik 提交于
Use modparams to activate protection information support. pi_enable bool: Based on this parameter iSER will know if it should support T10-PI. We don't want to do this by default as it requires to allocate and initialize extra resources. In case pi_enable=N, iSER won't publish to SCSI midlayer any DIF capabilities. pi_guard int: Based on this parameter iSER will publish DIX guard type support to SCSI midlayer. 0 means CRC is allowed to be passed in DIX buffers, 1 (or non-zero) means IP-CSUM is allowed to be passed in DIX buffers. Note that over the wire, only CRC is allowed. In the next phase, it is worth considering passing these parameters from iscsid via nlmsg. This will allow these parameters to be connection based rather than global. Signed-off-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
In T10-PI support we will have memory keys for protection buffers and signature transactions. We prefer to compact indicators rather than keeping multiple bools. This commit does not change any functionality. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
For T10-PI offload support, we will need to know the device signature offload capability upon every connection establishment. This patch does not change any functionality. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
fastreg descriptor will include protection information context. In order to place the logic in one place we introduce iser_create_fr_desc function. This patch does not change any functionality. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
FRWR stands for "fast registration work request". We want to avoid calling the fastreg pool with that name, instead we name it fastreg which stands for "fast registration". This pool will include more elements in the future, so it is a good idea to generalize the name. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
由 Sagi Grimberg 提交于
In case iSER uses fast registration method, it should not request for successful completions on fast registration nor local invalidate requests. We color wr_id with ISER_FRWR_LI_WRID in order to correctly consume error completions. Signed-off-by: NSagi Grimberg <sagig@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-
- 15 2月, 2014 1 次提交
-
-
由 Roi Dayan 提交于
Fix a possible NULL pointer dereference in disconnection flow. This can happen if the target disconnected/rejected the connection request, e.g before the binding stage between iscsi connection to the transport connection. Signed-off-by: NAlex Tabachnik <alext@mellanox.com> Signed-off-by: NRoi Dayan <roid@mellanox.com> Signed-off-by: NOr Gerlitz <ogerlitz@mellanox.com> Signed-off-by: NRoland Dreier <roland@purestorage.com>
-