sched: Make sure task has correct sched_class after policy change
From the code in rt_mutex_setprio(), it is evident that the intention is that task's with a RT 'prio' value as a consequence of receiving a PI boost also have their 'sched_class' field set to '&rt_sched_class'. However, Peter noticed that the code in __setscheduler() could result in this intention being frustrated. Fix it. Reported-by: NPeter Williams <pwil3058@bigpond.net.au> Signed-off-by: NPeter Zijlstra <a.p.zijlstra@chello.nl> Cc: Mike Galbraith <efault@gmx.de> LKML-Reference: <1257880321.4108.457.camel@laptop> Signed-off-by: NIngo Molnar <mingo@elte.hu>
Showing
想要评论请 注册 或 登录