task_work: add a scheduling point in task_work_run()
It seems commit 4a9d4b02 (switch fput to task_work_add) reintroduced the problem addressed in commit 944be0b2 (close_files(): add scheduling point) If a server process with a lot of files (say 2 million tcp sockets) is killed, we can spend a lot of time in task_work_run() and trigger a soft lockup. Signed-off-by: NEric Dumazet <edumazet@google.com> Signed-off-by: NAl Viro <viro@zeniv.linux.org.uk>
Showing
想要评论请 注册 或 登录