sched: rt group scheduling
Extend group scheduling to also cover the realtime classes. It uses the time limiting introduced by the previous patch to allow multiple realtime groups. The hard time limit is required to keep behaviour deterministic. The algorithms used make the realtime scheduler O(tg), linear scaling wrt the number of task groups. This is the worst case behaviour I can't seem to get out of, the avg. case of the algorithms can be improved, I focused on correctness and worst case. [ akpm@linux-foundation.org: move side-effects out of BUG_ON(). ] Signed-off-by: NPeter Zijlstra <a.p.zijlstra@chello.nl> Signed-off-by: NIngo Molnar <mingo@elte.hu>
Showing
想要评论请 注册 或 登录