-
由 Paolo Bonzini 提交于
Protect the list of queued work items with something other than the BQL, as a preparation for running the work items outside it. Reviewed-by: NPeter Maydell <peter.maydell@linaro.org> Signed-off-by: NKONRAD Frederic <fred.konrad@greensocs.com> Signed-off-by: NPaolo Bonzini <pbonzini@redhat.com>
376692b9