drm/omap: panel-tpo-td028ttec1: Add note for incorrect sync drive edge
According to the datasheet of the panel, both data, DEN and sync signals are expected to be driven on the falling edge of the DOTCLK. Signed-off-by: NPeter Ujfalusi <peter.ujfalusi@ti.com> Signed-off-by: NTomi Valkeinen <tomi.valkeinen@ti.com>
Showing
想要评论请 注册 或 登录