-
由 Karsten Graul 提交于
When a new ib device is up smc will send an add link invitation to the peer if needed. This is currently done with rudimentary flow control. Under high workload these add link invitations can disturb other llc flows because they arrive unexpected. Fix this by integrating the invitations into the normal llc event flow and handle them as a flow. While at it, check for already assigned requests in the flow before the new add link request is assigned. Reviewed-by: NUrsula Braun <ubraun@linux.ibm.com> Fixes: 1f90a05d ("net/smc: add smcr_port_add() and smcr_link_up() processing") Signed-off-by: NKarsten Graul <kgraul@linux.ibm.com> Signed-off-by: NDavid S. Miller <davem@davemloft.net>
c48254fa