-
由 Liam Girdwood 提交于
Connect the DAPM graph through each BE DAI link to the componnent(s) on the other side of the BE DAI link. This allows the graph to be walked on both sides of the link when graph changes are made. Signed-off-by: NLiam Girdwood <liam.r.girdwood@linux.intel.com> Signed-off-by: NMark Brown <broonie@linaro.org>
b893ea5f