-
由 Gleb Natapov 提交于
If a task switch was initiated because off a task gate in IDT and IDT was accessed because of an external even the instruction should not be skipped. Signed-off-by: NGleb Natapov <gleb@redhat.com> Signed-off-by: NAvi Kivity <avi@redhat.com>
8317c298