-
由 Adrian Freund 提交于
The documentation claims that two sched groups must not overlap. This is no longer true, as overlapping sched groups are used on NUMA systems. This change has been introduced by commit e3589f6c and was documented by an in-code comment in commit 35a566e6. Signed-off-by: NAdrian Freund <adrian@freund.io> Link: https://lore.kernel.org/r/20200407130525.76663-1-adrian@freund.ioSigned-off-by: NJonathan Corbet <corbet@lwn.net>
7b912104