-
由 Brenda J. Butler 提交于
With option -P, the test script will pause just before the post_suite functions are called. This allows the tester to inspect the system before it is torn down. Signed-off-by: NBrenda J. Butler <bjb@mojatatu.com> Signed-off-by: NDavid S. Miller <davem@davemloft.net>
2b3905de