- 09 8月, 2007 33 次提交
-
-
由 Ingo Molnar 提交于
round a tiny bit better in high-frequency rescheduling scenarios, by rounding around zero instead of rounding down. (this is pretty theoretical though) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
do small deltas in the weight and multiplication constant table so that the worst-case numeric error is better than 1:100000000. (8 digits) the current error table is: nice mult * inv_mult error ------------------------------------------ -20: 88761 * 48388 -0.0000000065 -19: 71755 * 59856 -0.0000000037 -18: 56483 * 76040 0.0000000056 -17: 46273 * 92818 0.0000000042 -16: 36291 * 118348 -0.0000000065 -15: 29154 * 147320 -0.0000000037 -14: 23254 * 184698 -0.0000000009 -13: 18705 * 229616 -0.0000000037 -12: 14949 * 287308 -0.0000000009 -11: 11916 * 360437 -0.0000000009 -10: 9548 * 449829 -0.0000000009 -9: 7620 * 563644 -0.0000000037 -8: 6100 * 704093 0.0000000009 -7: 4904 * 875809 0.0000000093 -6: 3906 * 1099582 -0.0000000009 -5: 3121 * 1376151 -0.0000000058 -4: 2501 * 1717300 0.0000000009 -3: 1991 * 2157191 -0.0000000035 -2: 1586 * 2708050 0.0000000009 -1: 1277 * 3363326 0.0000000014 0: 1024 * 4194304 0.0000000000 1: 820 * 5237765 0.0000000009 2: 655 * 6557202 0.0000000033 3: 526 * 8165337 -0.0000000079 4: 423 * 10153587 0.0000000012 5: 335 * 12820798 0.0000000079 6: 272 * 15790321 0.0000000037 7: 215 * 19976592 -0.0000000037 8: 172 * 24970740 -0.0000000037 9: 137 * 31350126 -0.0000000079 10: 110 * 39045157 -0.0000000061 11: 87 * 49367440 -0.0000000037 12: 70 * 61356676 0.0000000056 13: 56 * 76695844 -0.0000000075 14: 45 * 95443717 -0.0000000072 15: 36 * 119304647 -0.0000000009 16: 29 * 148102320 -0.0000000037 17: 23 * 186737708 -0.0000000028 18: 18 * 238609294 -0.0000000009 19: 15 * 286331153 -0.0000000002 Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
optimize update_rq_clock() calls in the load-balancer: update them right after locking the runqueue(s) so that the pull functions do not have to call it. Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
optimize activate_task() by removing update_rq_clock() from it. (and add update_rq_clock() to all callsites of activate_task() that did not have it before.) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
move the __update_rq_clock() call from update_cpu_load() to scheduler_tick(). ( identity transformation that causes no change in functionality. ) this allows the direct use of rq->clock in ->task_tick() functions. Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
final step: remove all (now superfluous) 'u64 now' variables. ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from deactivate_task(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from dequeue_task(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from enqueue_task(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from dec_nr_running(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from inc_nr_running(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from dec_load(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from inc_load(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from update_curr_load(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from ->task_new(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from ->put_prev_task(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from pick_next_task(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from ->pick_next_task(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from ->dequeue_task(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the 'u64 now' parameter from ->enqueue_task(). ( identity transformation that causes no change in functionality. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
change all 'now' timestamp uses in assignments to rq->clock. ( this is an identity transformation that causes no functionality change: all such new rq->clock is necessarily preceded by an update_rq_clock() call. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the (now unused) __rq_clock() function. Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
eliminate __rq_clock() use by changing it to: __update_rq_clock(rq) now = rq->clock; identity transformation - no change in behavior. Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
remove the now unused rq_clock() function. Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
eliminate rq_clock() use by changing it to: update_rq_clock(rq) now = rq->clock; identity transformation - no change in behavior. Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
add the [__]update_rq_clock(rq) functions. (No change in functionality, just reorganization to prepare for elimination of the heavy 64-bit timestamp-passing in the scheduler.) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Peter Williams 提交于
There are two problems with balance_tasks() and how it used: 1. The variables best_prio and best_prio_seen (inherited from the old move_tasks()) were only required to handle problems caused by the active/expired arrays, the order in which they were processed and the possibility that the task with the highest priority could be on either. These issues are no longer present and the extra overhead associated with their use is unnecessary (and possibly wrong). 2. In the absence of CONFIG_FAIR_GROUP_SCHED being set, the same this_best_prio variable needs to be used by all scheduling classes or there is a risk of moving too much load. E.g. if the highest priority task on this at the beginning is a fairly low priority task and the rt class migrates a task (during its turn) then that moved task becomes the new highest priority task on this_rq but when the sched_fair class initializes its copy of this_best_prio it will get the priority of the original highest priority task as, due to the run queue locks being held, the reschedule triggered by pull_task() will not have taken place. This could result in inappropriate overriding of skip_for_load and excessive load being moved. The attached patch addresses these problems by deleting all reference to best_prio and best_prio_seen and making this_best_prio a reference parameter to the various functions involved. load_balance_fair() has also been modified so that this_best_prio is only reset (in the loop) if CONFIG_FAIR_GROUP_SCHED is set. This should preserve the effect of helping spread groups' higher priority tasks around the available CPUs while improving system performance when CONFIG_FAIR_GROUP_SCHED isn't set. Signed-off-by: NPeter Williams <pwil3058@bigpond.net.au> Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Alexey Dobriyan 提交于
kernel.sched_domain hierarchy is under CTL_UNNUMBERED and thus unreachable to sysctl(2). Generating .ctl_number's in such situation is not useful. Signed-off-by: NAlexey Dobriyan <adobriyan@sw.ru> Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
speed up schedule(): share the 'now' parameter that deactivate_task() was calculating internally. ( this also fixes the small accounting window between the deactivate call and the pick_next_task() call. ) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
uninline rq_clock() to save 263 bytes of code: text data bss dec hex filename 39561 3642 24 43227 a8db sched.o.before 39298 3642 24 42964 a7d4 sched.o.after Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ulrich Drepper 提交于
here's another tiny cleanup. The generated code is not affected (gcc is smart enough) but for people looking over the code it is just irritating to have the extra conditional. Signed-off-by: NUlrich Drepper <drepper@redhat.com> Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Peter Williams 提交于
The move_tasks() function is currently multiplexed with two distinct capabilities: 1. attempt to move a specified amount of weighted load from one run queue to another; and 2. attempt to move a specified number of tasks from one run queue to another. The first of these capabilities is used in two places, load_balance() and load_balance_idle(), and in both of these cases the return value of move_tasks() is used purely to decide if tasks/load were moved and no notice of the actual number of tasks moved is taken. The second capability is used in exactly one place, active_load_balance(), to attempt to move exactly one task and, as before, the return value is only used as an indicator of success or failure. This multiplexing of sched_task() was introduced, by me, as part of the smpnice patches and was motivated by the fact that the alternative, one function to move specified load and one to move a single task, would have led to two functions of roughly the same complexity as the old move_tasks() (or the new balance_tasks()). However, the new modular design of the new CFS scheduler allows a simpler solution to be adopted and this patch addresses that solution by: 1. adding a new function, move_one_task(), to be used by active_load_balance(); and 2. making move_tasks() a single purpose function that tries to move a specified weighted load and returns 1 for success and 0 for failure. One of the consequences of these changes is that neither move_one_task() or the new move_tasks() care how many tasks sched_class.load_balance() moves and this enables its interface to be simplified by returning the amount of load moved as its result and removing the load_moved pointer from the argument list. This helps simplify the new move_tasks() and slightly reduces the amount of work done in each of sched_class.load_balance()'s implementations. Further simplification, e.g. changes to balance_tasks(), are possible but (slightly) complicated by the special needs of load_balance_fair() so I've left them to a later patch (if this one gets accepted). NB Since move_tasks() gets called with two run queue locks held even small reductions in overhead are worthwhile. [ mingo@elte.hu ] this change also reduces code size nicely: text data bss dec hex filename 39216 3618 24 42858 a76a sched.o.before 39173 3618 24 42815 a73f sched.o.after Signed-off-by: NPeter Williams <pwil3058@bigpond.net.au> Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
Peter Williams suggested to flip the order of update_cpu_load(rq) with the ->task_tick() call. This is a NOP for the current scheduler (the two functions are independent of each other), ->task_tick() might create some state for update_cpu_load() in the future (or in PlugSched). Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
- 02 8月, 2007 7 次提交
-
-
由 Ingo Molnar 提交于
move the rest of the debugging/instrumentation code to under CONFIG_SCHEDSTATS too. This reduces code size and speeds code up: text data bss dec hex filename 33044 4122 28 37194 914a sched.o.before 32708 4122 28 36858 8ffa sched.o.after Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
move load-calculation functions so that they can use the per-policy declarations and methods. Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
make sched_class.task_new == NULL a 'default method', this allows the removal of task_rt_new. Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
uninline inc_nr_running() and dec_nr_running(): text data bss dec hex filename 29039 4162 24 33225 81c9 sched.o.before 29027 4162 24 33213 81bd sched.o.after Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
uninline calc_delta_mine(): text data bss dec hex filename 29162 4162 24 33348 8244 sched.o.before 29039 4162 24 33225 81c9 sched.o.after Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Ingo Molnar 提交于
use fixed limit in calc_delta_mine() - this saves an instruction :) Signed-off-by: NIngo Molnar <mingo@elte.hu>
-
由 Peter Williams 提交于
1. The only place that RTPRIO_TO_LOAD_WEIGHT() is used is in the call to move_tasks() in the function active_load_balance() and its purpose here is just to make sure that the load to be moved is big enough to ensure that exactly one task is moved (if there's one available). This can be accomplished by using ULONG_MAX instead and this allows RTPRIO_TO_LOAD_WEIGHT() to be deleted. 2. This, in turn, allows PRIO_TO_LOAD_WEIGHT() to be deleted. 3. This allows load_weight() to be deleted which allows TIME_SLICE_NICE_ZERO to be deleted along with the comment above it. Signed-off-by: NPeter Williams <pwil3058@bigpond.net.au> Signed-off-by: NIngo Molnar <mingo@elte.hu>
-