提交 e95ef5d3 编写于 作者: A Andre Detsch 提交者: David S. Miller

cxgb3: Wait longer for control packets on initialization

In some Power7 platforms, when using VIOS (Virtual I/O Server), we
need to wait longer for control packets to finish transfer during
initialization.
Without this change, initialization may fail prematurely.
Signed-off-by: NWen Xiong <wenxiong@us.ibm.com>
Signed-off-by: NAndre Detsch <adetsch@br.ibm.com>
Acked-by: NDivy Le Ray <divy@chelsio.com>
Signed-off-by: NDavid S. Miller <davem@davemloft.net>
上级 6f461f6c
...@@ -439,7 +439,7 @@ static void free_irq_resources(struct adapter *adapter) ...@@ -439,7 +439,7 @@ static void free_irq_resources(struct adapter *adapter)
static int await_mgmt_replies(struct adapter *adap, unsigned long init_cnt, static int await_mgmt_replies(struct adapter *adap, unsigned long init_cnt,
unsigned long n) unsigned long n)
{ {
int attempts = 5; int attempts = 10;
while (adap->sge.qs[0].rspq.offload_pkts < init_cnt + n) { while (adap->sge.qs[0].rspq.offload_pkts < init_cnt + n) {
if (!--attempts) if (!--attempts)
......
Markdown is supported
0% .
You are about to add 0 people to the discussion. Proceed with caution.
先完成此消息的编辑!
想要评论请 注册