io_uring: make IORING_OP_CANCEL_ASYNC deferrable
to #26323578 commit fbf23849b1724d3ea362e346d0877a8d87978fe6 upstream. If we defer this command as part of a link, we have to make sure that the SQE data has been read upfront. Integrate the async cancel op into the prep handling to make it safe for SQE reuse. Signed-off-by: NJens Axboe <axboe@kernel.dk> Signed-off-by: NJoseph Qi <joseph.qi@linux.alibaba.com> Acked-by: NXiaoguang Wang <xiaoguang.wang@linux.alibaba.com>
Showing
想要评论请 注册 或 登录