drm/i915/gvt: add basic function for weight control
This method tries to guarantee precision in second level, with the adjustment conducted in every 100ms. At the end of each vGPU switch calculate the sched time and subtract it from the time slice allocated; the allocated time slice for every 100ms together with remaining timeslice, will be used to decide how much timeslice allocated to this vGPU in the next 100ms slice, with the end goal to guarantee weight ratio in second level. Signed-off-by: NPing Gao <ping.a.gao@intel.com> Reviewed-by: NKevin Tian <kevin.tian@intel.com> Signed-off-by: NZhenyu Wang <zhenyuw@linux.intel.com>
Showing
想要评论请 注册 或 登录