drm/i915/skl: Stage the pipe DDB allocation
To correctly flush the new DDB allocation we need to know about the pipe allocation layout inside the DDB in order to sequence the re-allocation to not cause a newly allocated pipe to fetch from a space that was previously allocated to another pipe. This patch preserves the per-pipe (start,end) allocation to be used in the flush. Reviewed-by: NVille Syrjälä <ville.syrjala@linux.intel.com> Signed-off-by: NDamien Lespiau <damien.lespiau@intel.com> Signed-off-by: NDaniel Vetter <daniel.vetter@ffwll.ch>
Showing
想要评论请 注册 或 登录