drm/i915/gvt: factor out the scheduler
Factor out the scheduler to a more clear structure, the basic logic is to find out next vGPU first and then schedule it. vGPUs were ordered in a LRU list, scheduler scan from the LRU list head and choose the first vGPU who has pending workload. Signed-off-by: NPing Gao <ping.a.gao@intel.com> Reviewed-by: NKevin Tian <kevin.tian@intel.com> Signed-off-by: NZhenyu Wang <zhenyuw@linux.intel.com>
Showing
想要评论请 注册 或 登录