-
由 Manasi Navare 提交于
This patch adds support to handle automated DP compliance link training test requests. This patch has been tested with Unigraf DPR-120 DP Compliance device for testing Link Training Compliance. After we get a short pulse Compliance test request, test request values are read and hotplug uevent is sent in order to trigger another modeset during which the pipe is configured and link is retrained and enabled for link parameters requested by the test. v5: * Only modify the compliance structure after all validation is done (Jani Nikula) * Remove the variable test_result (Jani Nikula) v4: * Return TEST_NAK for read failures and invalid values (Jani Nikula) * Conver the test link BW to link rate before storing (Jani Nikula) v3: * Validate the test link rate and lane count as soon as the request comes (Jani Nikula) v2: * Validate the test lane count before using it in intel_dp_compute_config (Jani Nikula) Signed-off-by: NManasi Navare <manasi.d.navare@intel.com> Cc: Jani Nikula <jani.nikula@linux.intel.com> Cc: Daniel Vetter <daniel.vetter@intel.com> Cc: Ville Syrjala <ville.syrjala@linux.intel.com> Signed-off-by: NJani Nikula <jani.nikula@intel.com> Link: http://patchwork.freedesktop.org/patch/msgid/1485274594-17361-1-git-send-email-manasi.d.navare@intel.com
da15f7cb