-
由 Ben Skeggs 提交于
SOR_PWR has no effect to power-off DP links, unlike other SOR protocols. Instead, on the source side, we cut power to the lanes after having put the sink into D3. Link training takes care of everything required to bring it back again. Signed-off-by: NBen Skeggs <bskeggs@redhat.com>
4874322e