1. 25 1月, 2017 1 次提交
  2. 19 1月, 2017 1 次提交
  3. 31 12月, 2016 1 次提交
  4. 06 12月, 2016 1 次提交
    • B
      Feature: delegate all open discussions to Issue · 1123057a
      Bob Van Landuyt 提交于
      When a merge request can only be merged when all discussions are
      resolved. This feature allows to easily delegate those discussions to a
      new issue, while marking them as resolved in the merge request.
      
      The user is presented with a new issue, prepared with mentions of all
      unresolved discussions, including the first unresolved note of the
      discussion, time and link to the note.
      
      When the issue is created, the discussions in the merge request will get
      a system note directing the user to the newly created issue.
      1123057a
  5. 01 12月, 2016 1 次提交
  6. 26 11月, 2016 1 次提交
  7. 19 11月, 2016 1 次提交
  8. 16 11月, 2016 1 次提交
  9. 08 11月, 2016 1 次提交
  10. 04 11月, 2016 2 次提交
  11. 20 10月, 2016 2 次提交
  12. 14 10月, 2016 1 次提交
  13. 13 10月, 2016 1 次提交
  14. 05 10月, 2016 1 次提交
  15. 16 9月, 2016 1 次提交
  16. 30 8月, 2016 3 次提交
    • K
      Improve grammar · 6b02c82c
      Katarzyna Kobierska 提交于
      6b02c82c
    • K
      Improve code · 2e08f115
      Katarzyna Kobierska 提交于
      2e08f115
    • K
      User can edit closed MR with deleted fork · c9c2503c
      Katarzyna Kobierska 提交于
      Add test for closed MR without fork
      
      Add view test visibility of Reopen and Close buttons
      
      Fix controller tests and validation method
      
      Fix missing space
      
      Remove unused variables from test
      
      closed_without_fork? method refactoring
      
      Add information about missing fork
      
      When closed MR without fork can't edit target branch
      
      Tests for closed MR edit view
      
      Fix indentation and rebase, refactoring
      c9c2503c
  17. 22 8月, 2016 2 次提交
  18. 18 8月, 2016 2 次提交
  19. 17 8月, 2016 1 次提交
  20. 13 8月, 2016 2 次提交
  21. 20 7月, 2016 6 次提交
  22. 16 7月, 2016 1 次提交
  23. 14 7月, 2016 1 次提交
  24. 13 7月, 2016 1 次提交
  25. 07 7月, 2016 2 次提交
  26. 17 6月, 2016 2 次提交