Allow valgrind_check to run in parallel
Summary: Extend "J=<parallel>" to valgrind_check. For DBTest, modify the script to run valgrind. For other tests, prefix launch command with valgrind. Test Plan: Run valgrind_check with J=1 and J>1 and make sure tests run under valgrind. Manually change codes to introduce memory leak and make sure "make watch-log" correctly report it. Reviewers: yhchiang, yiwu, andrewkr, kradhakrishnan, IslamAbdelRahman Reviewed By: kradhakrishnan, IslamAbdelRahman Subscribers: leveldb, andrewkr, dhruba Differential Revision: https://reviews.facebook.net/D56727
Showing
想要评论请 注册 或 登录