1. 30 9月, 2017 1 次提交
  2. 29 9月, 2017 2 次提交
  3. 28 9月, 2017 1 次提交
  4. 26 9月, 2017 1 次提交
  5. 25 9月, 2017 1 次提交
    • P
      Add pipeline support for AIX clients and loaders · 68362b41
      Peifeng Qiu 提交于
      Concourse doesn't support AIX natively, we need to clone the repo
      with the correspond commit on remote machine, compile the packages,
      and download them back to concourse container as output.
      
      Testing client and loader for platform without gpdb server is
      another challenge. We setup GPDB server on concourse container just
      like most installcheck tests, and use SSH tunnel to forward ports
      from and to the remote host. This way both CL tools and GPDB server
      feel they are on the same machine, and the test can run normally.
      68362b41
  6. 23 9月, 2017 1 次提交
  7. 16 9月, 2017 1 次提交
  8. 15 9月, 2017 2 次提交
  9. 14 9月, 2017 1 次提交
  10. 13 9月, 2017 1 次提交
    • A
      Adding trigger to control freqeuncy of run. · 5937b14e
      Ashwin Agrawal 提交于
      Need flexibility to be able to control at what freqeuncy pipeline gets triggerd,
      one such usecase is same pipleine code runs with asserts on every commit and
      without asserts daily/weekly. So, adding a time resource via which can control
      the triggering. Plus, parameterize the trigger to control the things.
      5937b14e
  11. 09 9月, 2017 1 次提交
  12. 07 9月, 2017 1 次提交
  13. 06 9月, 2017 3 次提交
  14. 02 9月, 2017 1 次提交
  15. 01 9月, 2017 2 次提交
  16. 31 8月, 2017 1 次提交
    • L
      Bundle PXF with GPDB by default (#3109) · 6ba40dfb
      Lav Jain 提交于
      * Refactor GPHDFS regression to run for pxf
      
      * remove customized Hadoop home location
      
      * PXF tarball creation inside GPDB pipeline
      
      * Remove legacy directory
      
      * Use enable_pxf instead of with_pxf
      6ba40dfb
  17. 26 8月, 2017 1 次提交
  18. 23 8月, 2017 2 次提交
  19. 15 8月, 2017 1 次提交
  20. 11 8月, 2017 3 次提交
  21. 09 8月, 2017 2 次提交
  22. 08 8月, 2017 1 次提交
  23. 05 8月, 2017 3 次提交
  24. 04 8月, 2017 1 次提交
  25. 02 8月, 2017 2 次提交
  26. 01 8月, 2017 2 次提交
  27. 28 7月, 2017 1 次提交