提交 ffda0803 编写于 作者: A Alan Stern 提交者: Greg Kroah-Hartman

USB: EHCI: add missing frame -> microframe conversion

This patch (as1407) fixes a bug in ehci-hcd's isochronous scheduler.
All its calculations should be done in terms of microframes, but for
full-speed devices, sched->span is stored in frames.  It needs to be
converted.

This fix is liable to expose problems in other drivers.  The old code
would accept URBs that should not have been accepted, so drivers have
had no reason to avoid submitting URBs that exceeded the maximum
schedule length.  In an attempt to partially compensate for this, the
patch also adjusts the schedule length from a minimum of 256 frames up
to a minimum of 512 frames.
Signed-off-by: NAlan Stern <stern@rowland.harvard.edu>
CC: David Brownell <david-b@pacbell.net>
Signed-off-by: NGreg Kroah-Hartman <gregkh@suse.de>
上级 bccbefaa
......@@ -79,7 +79,13 @@ static const char hcd_name [] = "ehci_hcd";
#define EHCI_TUNE_RL_TT 0
#define EHCI_TUNE_MULT_HS 1 /* 1-3 transactions/uframe; 4.10.3 */
#define EHCI_TUNE_MULT_TT 1
#define EHCI_TUNE_FLS 2 /* (small) 256 frame schedule */
/*
* Some drivers think it's safe to schedule isochronous transfers more than
* 256 ms into the future (partly as a result of an old bug in the scheduling
* code). In an attempt to avoid trouble, we will use a minimum scheduling
* length of 512 frames instead of 256.
*/
#define EHCI_TUNE_FLS 1 /* (medium) 512-frame schedule */
#define EHCI_IAA_MSECS 10 /* arbitrary */
#define EHCI_IO_JIFFIES (HZ/10) /* io watchdog > irq_thresh */
......
......@@ -1395,28 +1395,31 @@ iso_stream_schedule (
struct ehci_iso_stream *stream
)
{
u32 now, next, start, period;
u32 now, next, start, period, span;
int status;
unsigned mod = ehci->periodic_size << 3;
struct ehci_iso_sched *sched = urb->hcpriv;
if (sched->span > (mod - SCHEDULE_SLOP)) {
period = urb->interval;
span = sched->span;
if (!stream->highspeed) {
period <<= 3;
span <<= 3;
}
if (span > mod - SCHEDULE_SLOP) {
ehci_dbg (ehci, "iso request %p too long\n", urb);
status = -EFBIG;
goto fail;
}
if ((stream->depth + sched->span) > mod) {
if (stream->depth + span > mod) {
ehci_dbg (ehci, "request %p would overflow (%d+%d>%d)\n",
urb, stream->depth, sched->span, mod);
urb, stream->depth, span, mod);
status = -EFBIG;
goto fail;
}
period = urb->interval;
if (!stream->highspeed)
period <<= 3;
now = ehci_readl(ehci, &ehci->regs->frame_index) & (mod - 1);
/* Typical case: reuse current schedule, stream is still active.
......@@ -1445,7 +1448,7 @@ iso_stream_schedule (
period);
/* Tried to schedule too far into the future? */
if (unlikely(((start - now) & (mod - 1)) + sched->span
if (unlikely(((start - now) & (mod - 1)) + span
>= mod - 2 * SCHEDULE_SLOP)) {
status = -EFBIG;
goto fail;
......
Markdown is supported
0% .
You are about to add 0 people to the discussion. Proceed with caution.
先完成此消息的编辑!
想要评论请 注册