sched: fix broken SMT/MC optimizations
On a four package system with HT - HT load balancing optimizations were broken. For example, if two tasks end up running on two logical threads of one of the packages, scheduler is not able to pull one of the tasks to a completely idle package. In this scenario, for nice-0 tasks, imbalance calculated by scheduler will be 512 and find_busiest_queue() will return 0 (as each cpu's load is 1024 > imbalance and has only one task running). Similarly MC scheduler optimizations also get fixed with this patch. [ mingo@elte.hu: restored fair balancing by increasing the fuzz and adding it back to the power decision, without the /2 factor. ] Signed-off-by: NSuresh Siddha <suresh.b.siddha@intel.com> Signed-off-by: NIngo Molnar <mingo@elte.hu>
Showing
想要评论请 注册 或 登录