sched: Fix missing sched tunable recalculation on cpu add/remove
Based on Peter Zijlstras patch suggestion this enables recalculation of the scheduler tunables in response of a change in the number of cpus. It also adds a max of eight cpus that are considered in that scaling. Signed-off-by: NChristian Ehrhardt <ehrhardt@linux.vnet.ibm.com> Signed-off-by: NPeter Zijlstra <a.p.zijlstra@chello.nl> LKML-Reference: <1259579808-11357-2-git-send-email-ehrhardt@linux.vnet.ibm.com> Signed-off-by: NIngo Molnar <mingo@elte.hu>
Showing
想要评论请 注册 或 登录