1. 12 2月, 2018 3 次提交
  2. 11 2月, 2018 6 次提交
  3. 10 2月, 2018 3 次提交
  4. 09 2月, 2018 6 次提交
  5. 08 2月, 2018 5 次提交
    • C
      refine prior_box · 19749d52
      chengduoZH 提交于
      19749d52
    • C
      add Python interface of prior_boxes · dd6b59da
      chengduoZH 提交于
      dd6b59da
    • Y
      fix parallel op test (#8249) · 61811e9d
      Yang Yang(Tony) 提交于
      * Fix parallel.do with batch norm
      
      * Change log level
      
      * CopyShare AllPlaces
      
      * disable nccl test
      
      * bring back parallel_do test
      61811e9d
    • Q
      Add polynomial_decay and piecewise_decay (#8013) · 5cc2f0bd
      Qiao Longfei 提交于
      * init polynomial_decay
      
      * test polynomial_decay
      
      * complete polynomial_decay
      
      * fix conditional block op
      
      * init scalar-switch-case-op
      
      * switch op can compile
      
      * complete forward switch_op
      
      * add GetMatchCaseIndex
      
      * add switch_grad_op
      
      * init switch Python API
      
      * add test_switch
      
      * support set block list in python
      
      * fix scope problem
      
      * complete test
      
      * optimize test
      
      * optimize test
      
      * rm backward part
      
      * clear grad op
      
      * polynomial_decay use switch op
      
      * revert conditional_block_op and reshape_op
      
      * add piecewise_decay and test
      
      * fix piecewise_decay
      
      * try to use condition op for switch
      
      * can work
      
      * clean old code
      
      * revert
      
      * rm switch_op.cc
      
      * optimize code
      
      * add attr is_scalar_condition for condition_block_op
      
      * fix comment
      
      * fix comment
      
      * add export
      5cc2f0bd
    • W
      Fix equation in doc of fluid.layers.fc (#8243) · 8e5bc804
      whs 提交于
      8e5bc804
  6. 07 2月, 2018 1 次提交
  7. 06 2月, 2018 2 次提交
  8. 02 2月, 2018 4 次提交
  9. 01 2月, 2018 1 次提交
  10. 31 1月, 2018 1 次提交
  11. 30 1月, 2018 2 次提交
  12. 29 1月, 2018 1 次提交
  13. 28 1月, 2018 1 次提交
  14. 25 1月, 2018 3 次提交
  15. 24 1月, 2018 1 次提交